index
:
nuttx
kinetis-k20/nuttx_master_local_configs
kinetis-k20/nuttx_next
kinetis-k20/nuttx_next-old
master
teensy31-7.6
Port of the Nuttx operating system (http://www.nuttx.org/) to the Kinetis K20 architecture.
summary
refs
log
tree
commit
diff
log msg
author
committer
range
path:
root
/
apps
/
ChangeLog.txt
Commit message (
Expand
)
Author
Age
Files
Lines
*
Add a test for NX text displays and also a configuration for the STM3210E-EVAL
patacongo
2011-07-08
1
-0
/
+3
*
Verified STM3210E-EVAL button handling and new button test application
patacongo
2011-07-07
1
-0
/
+1
*
Changes for clean ez80 ZDS-II compile
patacongo
2011-06-22
1
-0
/
+2
*
Prep for 6.5 release
nuttx-6.5
patacongo
2011-06-21
1
-1
/
+4
*
FTPC simplification and size reduction
patacongo
2011-06-13
1
-0
/
+2
*
Prep for 6.4 release
nuttx-6.4
patacongo
2011-06-06
1
-2
/
+2
*
Add a simple shell and configuration to verify the FTP client library
patacongo
2011-06-01
1
-0
/
+4
*
Rename all lpc313x to lpc31xx
patacongo
2011-05-27
1
-0
/
+1
*
Add E1000 PIC NIC driver from Yu Qiang
patacongo
2011-05-21
1
-0
/
+4
*
Prep for 6.3 release
nuttx-6.3
patacongo
2011-05-15
1
-1
/
+3
*
Update README files
patacongo
2011-05-14
1
-1
/
+1
*
fclose() was not flushing buffered data
patacongo
2011-05-13
1
-1
/
+1
*
Changes for clean RGMP compile
patacongo
2011-05-12
1
-0
/
+5
*
First set of changes to incorporate the RGMP port
patacongo
2011-05-12
1
-0
/
+2
*
Fix a netutils build issue
patacongo
2011-05-11
1
-0
/
+3
*
Ported Ficl to NuttX apps/
patacongo
2011-05-10
1
-2
/
+3
*
Pascal now installs in the apps/ directory
patacongo
2011-05-10
1
-0
/
+4
*
Prep for 6.2 release
nuttx-6.2
patacongo
2011-05-06
1
-1
/
+6
*
Prep for 6.1 release
nuttx-6.1
patacongo
2011-04-10
1
-1
/
+2
*
Changes for clean build of app/ directory with Windows toolchain
patacongo
2011-04-10
1
-1
/
+3
*
Renamed nuttapp to namedapp; add binfs to nammedapp/
patacongo
2011-03-28
1
-0
/
+4
*
Incorporate changes from Uros Platise
patacongo
2011-03-26
1
-21
/
+22
*
apps/ initialization now occurs during the earlier context build phase
patacongo
2011-03-24
1
-5
/
+10
*
More build fixes
patacongo
2011-03-20
1
-1
/
+4
*
Add apps/poweroff lpc17 hardware handshake
patacongo
2011-03-14
1
-3
/
+6
*
VSN/apps update
patacongo
2011-03-14
1
-0
/
+10